New Construction in Whittier, Clad in Fiber Cement Siding

Fiber cement lap siding over a ventilated gap for a new Whittier house: it holds paint under hard sun, drains after storms and gives termites nothing to eat.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Fiber cement lap siding is the cladding we put forward for the walls of a new Whittier house. The boards are pressed from cement and wood fiber and come primed from the factory. They hold paint through long stretches of hard sun, stay flat in dry wind, give termites and rot nothing to feed on and will not burn. Hung over a slim ventilated gap, they let the wall behind drain and dry after a hard storm.

Hanging the boards

Over the sheathing goes a weather resistive barrier, lapped shingle style, then vertical furring strips or a drainage mat that holds the siding off the wall. Insect screen closes the top and bottom of that gap while leaving it open to air. Each board is nailed through the furring into the studs at the spacing the maker lists, with its lap hiding the nails of the course below. Butt joints land on a stud or get a flashing tab behind them, and every cut end is primed before it goes up.

Openings, corners and paint

Windows and doors get a pan flashing below and a head flashing above, lapped into the barrier so water leaving the gap finds its way out. Trim at corners and openings is fiber cement too, so the whole skin ages at one rate. The bottom course stops a set distance above the ground and above any roof it meets, which keeps the board ends dry. A quality acrylic finish goes on last, and the inspector looks at the barrier and flashings before the siding covers them.

About our New Construction serviceEverything we build in Whittier

New Construction in Whittier: questions

Plan your project in Whittier

Tell us about the property and what you have in mind. We reply with a written next step.