ADU Construction in Lake View Terrace

Lake View Terrace ADUs placed by their water supply: a branch off the house line or a meter of its own, hose bibs on a fire-mapped lot, LADBS review.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A backyard unit on a Lake View Terrace lot can draw its water through a branch off the main house line, or through its own meter if the water provider grants one. The choice moves the unit. A branch starts at the house, so the unit sits where that short run reaches it without crossing the future foundation. A separate meter brings a service line from the curb, and the unit can follow that line along the side of the lot.

Branch line or separate meter

A branch is simple to build and keeps one water bill, though the house line and the meter then have to be large enough for both homes, which the plumber works out from what each will run. A separate meter starts with an application to the water provider, which sets the meter box at the curb and connects it to the main. We run the line from that box to the unit. Either way, the unit gets its own shutoff valve near its door. On a fire-mapped parcel we also add hose bibs on more than one side, so a garden hose can reach every wall.

What LADBS reads on the water sheet

Plans for a Lake View Terrace ADU go to LADBS for review, and the plumbing sheet shows the water route from the meter or the branch point to the unit, with the pipe size and the shutoff. Backfill waits until the line has held its test in front of the inspector. If the parcel is one of those in Lake View Terrace inside a mapped fire hazard zone, the reviewer also checks the ember rules for the unit's roof, vents and walls. We look up the mapping first, so the water plan and those exterior details are drawn together.

About our ADU Construction serviceEverything we build in Lake View Terrace

ADU Construction in Lake View Terrace: questions

Plan your project in Lake View Terrace

Tell us about the property and what you have in mind. We reply with a written next step.