Fire Rebuild & Reconstruction in Venice

Venice fire rebuild with a laundry and storage planned for damp air: a vented dryer, an exhaust fan, a utility sink and closets that keep air moving.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

In a damp coastal house, things that get wet need a place to dry. For a rebuilt Venice home we plan a laundry with a properly vented dryer, a fan that pulls moist air outside, a utility sink, and hooks for towels and jackets near the door. Closets on outside walls get louvered doors or a transfer grille so they do not turn musty. These daily details are settled before the plans are drawn.

A laundry that clears its own air

The dryer duct takes the shortest route to an outside wall, in smooth metal with a hood that closes when the dryer stops. An exhaust fan on a humidity switch clears what the dryer and a drying rack add to the room. A utility sink with a sprayer handles sandy or salty gear before it reaches the washer. The floor is tile or sheet vinyl with a drain pan under the washer. We place the room near an exterior door when the plan allows it.

Storage that stays dry

Still air lets dampness settle into closets and behind furniture on cool exterior walls. The whole-house ventilation fan the energy code requires keeps fresh air moving, and continuous insulation outside the sheathing keeps wall surfaces warmer, which cuts condensation. Linen and coat closets can take a transfer grille. LADBS reviews ventilation on the plans, and if the lot lies inside the coastal zone, a separate coastal review may come first. Each of these items is priced on its own line.

About our Fire Rebuild & Reconstruction serviceEverything we build in Venice

Fire Rebuild & Reconstruction in Venice: questions

Fire Rebuild & Reconstruction in other cities

Plan your project in Venice

Tell us about the property and what you have in mind. We reply with a written next step.