Structural Work in Venice for Rooms Lit From Above

Skylights cut into a rebuilt Venice roof need headers, doubled rafters and a curb that keeps water out, framed to an engineer's detail and inspected by LADBS.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Light from above changes how a room is used: a kitchen needs no lamps at noon, a hallway stops being a dark passage. If a fire repair already has a Venice roof open, a skylight can be framed in while the rafters are bare. Cutting rafters moves roof weight onto new headers and doubled members, so the opening follows an engineer's detail, with a curb built to keep water out on a coastal lot.

Framing the opening

Each rafter that is cut gets a header on both ends of the opening, and the rafters on either side are doubled so they can carry what the cut ones no longer do. Hangers rated for the load join the pieces. Where a ceiling hangs under the roof, a light shaft is framed between the two and lined with drywall, and its walls can be splayed to spread the light. On a repair with fire-damaged framing nearby, the engineer checks that the members kept beside the opening are sound enough to take the extra share.

Keeping the opening dry

A skylight leaks at its edges far more often than through the glass. We build a curb on the roof deck, wrap it with membrane that laps under the roofing upslope and over it downslope, and set step flashing along the sides. On a coastal lot, the flashing and fasteners are chosen to resist corrosion from air that carries salt. Condensation is the other water to manage: a well-sealed shaft and a glazed unit with an insulated frame keep indoor moisture from condensing and dripping onto the ceiling.

About our Structural Work serviceEverything we build in Venice

Structural Work in Venice: questions

Plan your project in Venice

Tell us about the property and what you have in mind. We reply with a written next step.