Fire Rebuild & Reconstruction in Santa Monica

Santa Monica fire rebuild with materials chosen for salt air: fiber cement siding, stainless fasteners, Class A roofing, city permits, coastal zone check.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Fiber cement siding is a sound pick for a Santa Monica rebuild. It does not burn, it shrugs off salt air and damp air near the ocean, and it holds paint well. We fasten it with stainless steel and back it with a weather barrier that lets the wall dry. That choice, and the reasons for it, go into the written scope at the very start, beside the foundation, framing and permits.

Metal that lasts near the water

Salt in the air speeds corrosion on exposed metal and on connectors hidden in the walls. We call for stainless or hot-dipped galvanized hold-downs, straps and nails where framing meets the foundation and at the roof. Flashing is a corrosion-resistant metal, window frames are rated for marine exposure, and the roof is a Class A assembly. Each item shows on the estimate with a note on why it was picked, so you can weigh it against the adjuster's allowance before anything is ordered.

Permits and the coastal zone

Santa Monica permits rebuilds through its own building and safety office. Depending on where the lot sits, it may also fall inside the state coastal zone, which can add a separate approval before the building permit. We find that out at the start, since it affects the design and the timing of each step. The city's reviewers then check structure, energy and fire resistance, and inspections follow the build from foundation to final. If the coastal approval applies, its conditions are carried into the building plans so the two reviews agree.

About our Fire Rebuild & Reconstruction serviceEverything we build in Santa Monica

Fire Rebuild & Reconstruction in Santa Monica: questions

Fire Rebuild & Reconstruction in other cities

Plan your project in Santa Monica

Tell us about the property and what you have in mind. We reply with a written next step.