Fire Rebuild & Reconstruction in San Pedro

San Pedro fire rebuild that locates a neighbor's footing near the shared line before digging, since a shallow one can mean shoring and a changed foundation.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

The footing of a neighbor's house or garage can sit just past a San Pedro property line, hidden below the soil. If our new foundation digs deeper than that footing and close to it, the neighbor's structure can lose support. So before we price the foundation, we find out where those footings are and how deep they run, and the engineer decides what protection the excavation needs.

Checking the neighbor's side of the line

We start with the survey line and look at the neighbor's walls from our side for cracks and settlement, photographing what we see. A small test hole dug by hand near the line can show how deep a footing goes, with the neighbor's permission where it is needed. LADBS records for the adjacent address may show what was built there. Those findings go to the structural engineer, who decides whether the new footing along that side can be dug as usual or needs protection.

When the neighbor's footing is shallow

The engineer may step the new footing up near the line, design underpinning or call for shoring to hold the soil while trenches are open. Excavation that could affect a neighbor's support generally requires written notice to that owner before work begins. In salt air, any steel left exposed in shoring or new hardware is coated. LADBS reviews the shoring and foundation drawings with the house plans, and an inspector checks the trench before concrete. Each protective step is priced as its own line, apart from the standard foundation.

About our Fire Rebuild & Reconstruction serviceEverything we build in San Pedro

Fire Rebuild & Reconstruction in San Pedro: questions

Plan your project in San Pedro

Tell us about the property and what you have in mind. We reply with a written next step.