Simi Valley ADU Construction From the Front Door In
Simi Valley ADU construction with an entry hall built for a rebuild: a tile floor, a coat closet, a code-width door and ember-rated choices on mapped lots.
The entry is the room in a Simi Valley ADU that meets the work site head on, since the unit may house you for the months the main house takes to rebuild. We draw it as a small hall with a tile floor that mops clean, a closet for coats and boots, and a bench by the door. On a parcel inside one of the fire hazard areas the state maps across parts of Simi Valley, that front door is chosen to resist embers too.
Sizing the entry hall
The building code asks for at least one egress door with a clear opening of 32 inches or more, and a small hall has to let that door swing all the way open while someone stands inside holding a box. A closet on the hinge side keeps coats out of the path, and a bench across from it gives a place to sit and pull boots off. Porcelain tile or polished concrete takes grit from a cleared lot without wearing through. The light switch sits at the latch side, and the electrical code calls for a switched light outside an entrance at grade level.
The front door on a mapped Simi Valley lot
When the state fire hazard map takes in the parcel, the wildfire chapter of the building code governs the exterior door. It has to take one of the forms the code accepts, such as a noncombustible door, solid-core wood of a set minimum thickness, or a door rated for 20 minutes of fire exposure. Glass in it can meet the rule as multipane glazing with at least one tempered pane. A concrete step outside keeps the doorway from holding anything that burns. Snug weatherstripping around the frame is good practice against blown embers and keeps work site dust out as well. The city inspector reads the door label and the glass marking at the final visit.
About our ADU Construction serviceEverything we build in Simi Valley
ADU Construction in Simi Valley: questions
Yes, provided the city approves the finished unit for occupancy before the house is done. Through those months the entry hall works as an airlock between the job and your rooms, holding muddy boots and jackets at the door. We lay out the crew's path along the far side of the lot, so their boots stay off the walk to your door.
One level and a floor area of 500 square feet or less are the limits for the package. We measure your Simi Valley lot before you sign, to see that the footprint clears its setbacks. For an address on the state fire map, the floor plan adds a door and window table naming the fire-resistant construction of each opening.
Sometimes. The wide car opening becomes the new front wall, framed in around the entry door and a window, and it needs a proper footing beneath it, since the old opening may rest on nothing more than the slab edge. A straightedge laid across the floor shows whether it falls toward that opening, which a tile entry cannot sit on. Studs and rafters are checked for heat damage too.
ADU Construction in other cities
More we build in Simi Valley
Plan your project in Simi Valley
Tell us about the property and what you have in mind. We reply with a written next step.

