ADU Construction in Rolling Hills

Rolling Hills ADUs placed after measuring the trees: trunk size, canopy and roots, footings that bridge them, roof debris, then plans, permit and the build.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Before a backyard unit gets a footprint on a Rolling Hills lot, our tape goes around the trees. We note each trunk's girth, how far its canopy reaches and how close it stands to where footings might go. A tree that came through a fire may be scorched on one side and weaker than it looks, so an arborist sees it before anything is placed near it. Those readings narrow where the unit can stand.

Roots, footings and branches

Roots spread well past the trunk, and digging a footing trench through them can harm the tree or leave voids that settle later. Where a unit has to stand close, the engineer can use a footing that bridges the main roots, such as a grade beam carried on piers. Branches over a roof drop leaves into gutters and can scrape the covering when the wind moves them, so the roof outline is planned with the canopy in view. On a coastal lot, gutters and fasteners under those branches are chosen to resist corrosion, since wet leaf litter holds damp against metal.

Protected trees and the permit

Some jurisdictions protect certain trees by species or size, and cutting one or its roots can need an approval of its own. We check that for the parcel before a site plan is drawn. The building department that serves Rolling Hills then reviews the ADU plans with every tree shown at its trunk and canopy line, along with the protection fencing set for construction. Inspections run in stages from the footing to the final, and that fencing stays up until heavy work near the roots is done. The parcel's status in the state coastal zone is looked up during the same check.

About our ADU Construction serviceEverything we build in Rolling Hills

ADU Construction in Rolling Hills: questions

Plan your project in Rolling Hills

Tell us about the property and what you have in mind. We reply with a written next step.