Palos Verdes Estates ADU Construction in Borate-Treated Framing

Palos Verdes Estates ADU construction framed in borate-treated lumber that resists termites and decay in damp ocean air, inside walls detailed to dry.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

For a Palos Verdes Estates ADU, we frame in borate-treated lumber, from the studs and top plates up to the rafters and roof sheathing. The mineral is forced deep into each board at the treating plant, and it stops termites and the fungi that rot wood held damp by moist ocean air. Treatment alone has limits, so the walls and roof around that frame are detailed to let it dry whenever water does reach it.

Where borate belongs in the frame

Borate holds in wood kept dry behind the wall wrap and roofing, and it can leach out of wood that stays wet. It therefore goes into the members that sit inside the building envelope: studs, top plates, blocking, rafters and sheathing. The sill plate resting on the foundation and any exterior deck framing get a preservative rated for ground contact. Lumber delivered to the lot stays covered, and we close the frame in with roofing and wrap as early as the schedule allows. Each piece carries a treatment stamp for the framing inspector, and every saw cut gets a brushed coat of borate solution.

Letting the walls dry

Window heads and sills are flashed into the wall wrap. Siding goes over a drainage gap, so water that slips behind it finds a way down and out at the base. Attic vents are sized to the code ratio for the space they serve. Before drywall we take moisture meter readings across the framing, and if any come back high, a dehumidifier works inside the closed shell until they drop. Drawings and the open frame are both checked by Palos Verdes Estates building staff. The parcel is also looked up against the state coastal zone map, and where a coastal permit applies, it comes before construction.

About our ADU Construction serviceEverything we build in Palos Verdes Estates

ADU Construction in Palos Verdes Estates: questions

Plan your project in Palos Verdes Estates

Tell us about the property and what you have in mind. We reply with a written next step.