ADU Construction in Rolling Hills Estates

Rolling Hills Estates ADUs with a storage room that stays dry: an inside wall, shelves held off cold walls, safe lighting and review of the floor plan.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A storage room keeps a Rolling Hills Estates backyard unit livable when a family moves into it during a rebuild. We plan it for boxes of salvaged things, files and new goods for the home, kept apart from the beds and the table. We set that room against an inside wall and give it a door that closes, deep shelving and a light switched at the doorway, so it stays dry and easy to use.

Keeping stored things dry

Near the coast, moist air can reach a closet on an outside wall and condense where that wall runs coolest, and mildew then grows behind boxes pressed against it. An inside wall avoids most of the problem. Where the room has to touch an exterior wall, that wall gets full insulation and the shelving stands off it by a hand's width, so air can move behind. A louvered door or a small transfer grille lets the room share the unit's conditioned air. Shelves are metal or sealed wood, and the flooring runs through from the rest of the unit with nothing to trap damp beneath it.

Code points even a storage room carries

The building department serving Rolling Hills Estates reviews the ADU plans, and a storage room still has rules to meet. An electrical panel may not be placed in a clothes closet, so the unit's subpanel goes on a wall elsewhere. A light fixture near shelving keeps a set distance from the stored goods, and an enclosed fixture is the sound choice there. Storage space also counts toward the unit's floor area, so the room is drawn inside the size limit along with everything else. We label it plainly on the floor plan, and the inspector checks its wiring at rough and its fixture at the final.

About our ADU Construction serviceEverything we build in Rolling Hills Estates

ADU Construction in Rolling Hills Estates: questions

Plan your project in Rolling Hills Estates

Tell us about the property and what you have in mind. We reply with a written next step.