ADU Construction in Lomita

A Lomita ADU with a roof and drainage planned around the rebuild: Class A covering, sized gutters, downspouts led clear of both foundations.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Rain on a Lomita backyard unit lands on a small roof and has to leave it without soaking the ground the main house will need. We pitch that roof so water falls to the side away from the property line, catch it in a gutter sized for a hard storm, and send each downspout to a pad or a drain line that carries it clear of both foundations, the new one and the one still to come.

A roof chosen for the rebuild

After a fire, the covering on a new roof is a decision worth making carefully, and we specify a Class A rated assembly on the ADU from the start. A pitched roof with asphalt shingles or concrete tile sheds water quickly. A low-slope roof can work too, but it needs a membrane, crickets behind any parapet and scuppers that are kept open. Inland sun and dry wind age sealant and flashing faster than the field of the roof, so we detail the edges, the vent boots and the wall flashing with materials that tolerate heat.

Where the water goes on a shared lot

The building department that serves Lomita checks the drainage on the site plan, and so do we. Finished ground around the unit falls away from its walls, at least 6 inches over the first stretch of yard. Downspouts empty onto splash pads or into solid pipe that leads to the street side or to a dry well where the soil drains well enough. None of it is allowed to send runoff onto a neighbor. Because the main house will be built later, we route those pipes where its footings will not cut through them.

About our ADU Construction serviceEverything we build in Lomita

ADU Construction in Lomita: questions

Plan your project in Lomita

Tell us about the property and what you have in mind. We reply with a written next step.