ADU Construction in Mar Vista, Attached or Detached

A Mar Vista ADU on a lot rebuilt after a fire, attached to the new house or standing apart, with LADBS plan review, a Coastal Zone check and inspected stages.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Should the ADU share a wall with the new house, or stand by itself in the yard? Asked at the first site meeting on a Mar Vista lot after a fire, it gets an answer before anything is sketched, since it reorders the rebuild. Attached, the unit is framed with the main house as one structure. Detached, it can go up first on its own footings and serve as your home while the larger house is built.

What an attached unit asks of the main house

A shared wall between two homes has to be a rated fire separation, built as a tested assembly with no gaps at the floor, the ceiling or the roof. Each home needs its own exterior entrance, and the two generally get separate heating, cooling and water heating. Sound matters on that wall too, so it is insulated and framed to limit what carries through. Because the unit is part of the main structure, it is hard to finish and occupy while the rest of the house is still open framing, and its plan check generally runs with the main house set.

A detached unit on a Westside lot

Standing apart, the ADU gets its own footings, roof and utility runs, and the lot needs room for the spacing the codes set between buildings, or rated walls where they stand close. In return, LADBS can permit and inspect it on its own schedule, and it can house you through the rest of the rebuild if the city allows early occupancy. One more check comes first on this Westside lot: where the Coastal Zone boundary runs in relation to the parcel. A lot inside that line may need a coastal permit or an exemption before the building permit can issue.

About our ADU Construction serviceEverything we build in Mar Vista

ADU Construction in Mar Vista: questions

Plan your project in Mar Vista

Tell us about the property and what you have in mind. We reply with a written next step.