Rebuilding in Pacoima, Los Angeles County

Rebuilding in Pacoima after a fire

Pacoima fire rebuild that starts at the foundation: soils testing, footings for clay that moves, a slab kept dry from below and LADBS checks before the pour.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add what you are interested in, your first name and a phone number or an email.

In a Pacoima rebuild, the foundation is studied before anything else is drawn, since the frame, the walls and the roof all bear on it. An inland valley lot may hold clay that shrinks through months of dry weather and swells after a soaking storm. The soils report therefore leads, and the engineer sizes the concrete, its steel and the base under the slab to suit what the test borings show.

Designing for clay that moves

Where borings find expansive clay, the footings are taken deeper, past the band of soil that changes most with moisture, and the slab may be thickened or post tensioned. A layer of compacted gravel goes down first, then a vapor retarder, so damp from below does not reach the flooring. Steel sits on chairs to stay in the middle of the concrete, and anchor bolts and hold downs are set at the spacing the structural sheets show before the pour. Fresh concrete is kept moist while it cures, which matters most on a hot afternoon.

Inspection before the concrete

LADBS handles Pacoima permits, as it does for every City of Los Angeles neighborhood. Its plan checker reads the foundation sheets beside the soils report and can ask for deeper footings or more steel before approving them. On site, an inspector looks at the open trenches, the reinforcing and the embedded hardware, and the concrete truck is booked only after that signature. If the soils engineer must observe the excavation, a letter from that visit goes into the file too. With the foundation signed, framing starts on a base designed for the ground beneath it.

Start your Pacoima project with a lot visit

Send the address and where things stand. We reply with the next step.