Windows & Doors in Pasadena
Windows and doors in Pasadena, CA: a front door that swings and seals well, built to the ember rules on mapped lots, with tempered glass where it is required.
Keys after work, a parcel left on the step, a guest at the bell: the front door of a rebuilt Pasadena house gets handled more than any other opening. It needs to swing without rubbing, latch with one push and seal tight against drafts and dust. Fire hazard maps cover sections of Pasadena, so on a lot inside one, the slab, its glass and the frame around it also have to satisfy the state ember-resistance rules.
A front door for a mapped lot
The state rule for exterior doors where the map applies can be met several ways. The outer face can be a noncombustible or ignition-resistant material, the door can be solid-core wood with stiles and rails at least 1-3/8 inches thick, it can carry a 20-minute fire rating, or it can be a model that passed the state test for exterior doors. Any glass set into the door has to meet the same requirement as a window. We pick the route that suits the look of the house, fit weatherstripping and a sweep that seal at the threshold, and list the product on the permit set.
Windows that live easily
The windows around that door have daily work too: letting air through at night, closing quietly and getting cleaned. Tilt-in sashes and casements make both sides of a pane reachable from indoors. On a mapped lot each new window needs insulated glass in which one or more panes are tempered, or glass block, a rated assembly or a model that passed the state window test, and we check the parcel before anything is ordered. Every sleeping room keeps a window big enough for emergency escape, with a sill low enough to climb over.
About our Windows & Doors serviceEverything we build in Pasadena
Windows & Doors in Pasadena: questions
Where a mapped zone covers the lot, yes for every exterior window: the insulated unit needs a tempered pane, unless glass block or a fire-rated assembly goes in. Off the map, tempered or other safety glass is still required at hazardous spots, such as a pane next to a door, a large pane close to the floor and glass by a tub.
A rebuild calls for full-frame windows, flashed into the new walls before the siding goes on. In an existing house each frame is judged on its own. A dry, square frame can take an insert that spares the plaster and trim. Rot, a racked corner or staining below the sill sends the frame out, and the opening gets new flashing.
The City of Pasadena handles window and door permits through its building and safety staff. A same-size swap may need only an energy form, while a new or resized opening needs plans that show the header. When the lot is mapped, the submittal also lists each window and door product and how it meets the ember rules. We assemble the package and file it.
Windows & Doors in other cities
More we build in Pasadena
What are you building in Pasadena?
Tell us about the property and what you have in mind. We reply with a written next step.

