Structural Work in Westlake Village, Trusses Included

Rebuilding a Westlake Village roof with trusses means a deferred submittal: truss calculations clear plan review before any truss is set on the walls.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

When a roof lost to fire in Westlake Village is rebuilt with manufactured trusses, the plan reviewer looks for a note on the drawings listing them as a deferred submittal. The truss maker's engineer designs each truss later, and those calculations go back to the building department for approval before the trusses are set. The reviewer also checks that every truss bears on a wall or beam drawn to carry it.

Truss layout, loads and connectors

The structural engineer sets the loads the trusses must carry, including the roof covering, any solar array and the ceiling under them. A Class A roof covering, which ember rules can require on lots within the mapped fire hazard zones of Westlake Village, may weigh more than what the old roof carried, and the truss and wall design accounts for it. Each truss is tied to its wall with a metal connector against uplift, and a girder truss, which picks up the ends of other trusses, needs a post and footing under each of its own ends. The inspector checks bracing and connectors before the ceiling goes up.

When the truss drawings arrive

Truss drawings can arrive after the rest of the set is approved, so the permit may be issued with the trusses still pending, and roof framing waits until their calculations clear review. Meanwhile the foundation and walls proceed, each inspected in turn. If a field condition forces a truss to change, its engineer revises the design and the reviewer sees the new sheet before that truss is installed. Every approval is kept with the job file, so what stands on the walls matches what was reviewed.

About our Structural Work serviceEverything we build in Westlake Village

Structural Work in Westlake Village: questions

Plan your project in Westlake Village

Tell us about the property and what you have in mind. We reply with a written next step.