Structural Work in Malibu That Sends Water Away

Malibu structural repair built around drainage: footings and sills kept dry, corrosion-resistant hardware near the ocean, permits through the City of Malibu.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Footings and sill plates on a Malibu lot can meet water from more than one direction. Roof runoff and irrigation soaking the ground beside a wall both reach the base of a frame, and on a lot near the ocean, damp salty air adds to it. Structural repair there is designed around drainage, so new concrete and new wood stay dry, and the steel that ties them together is chosen to hold up against moisture.

Drainage around the foundation

Water standing against a footing can soften the soil it bears on, and wood kept wet at the sill will decay. The repair plan routes roof water through gutters and downspouts into lines that discharge away from the house, and the ground next to the foundation is graded so water runs outward. Where a wall holds back soil, it gets a drain behind it and a waterproof coating. If the lot slopes, a soils engineer may set how water is handled on the property, and the structural design follows that report.

Hardware, fire rules and the City of Malibu

Near the ocean, bare steel rusts faster, so connectors on a Malibu frame call for a heavy zinc coating or stainless steel, with nails and screws to match. The City of Malibu reviews the permit. Coastal zone status gets checked at the start, because a parcel within that boundary has an added review. Malibu also has land on the fire hazard maps, and a lot on that land may need exterior work to meet wildfire construction standards. All of it is drawn into one set, so the frame is built once and inspected as a whole.

About our Structural Work serviceEverything we build in Malibu

Structural Work in Malibu: questions

Plan your project in Malibu

Tell us about the property and what you have in mind. We reply with a written next step.