ADU Construction in San Marino

San Marino ADUs start with a pressure gauge on the water line: service size, pressure for two homes, the route to the unit, then plans, permit and build.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A pressure gauge on an outdoor faucet is the first thing we put on a San Marino lot before a backyard unit is planned. That reading, with the size of the water meter and the line from it, tells us whether the existing service can feed a second home with a shower and a kitchen running at once. After a fire, the same service may also have to supply the replacement house, so we measure for both.

What the water reading changes

If pressure is low or the line is small, the plan may call for upsizing the meter and the pipe from it, or adding a booster pump. If pressure runs high, a regulator protects the fixtures in both homes. The line to the unit runs in its own trench with a shutoff valve the family can reach. We also check whether the main house will need fire sprinklers, since a unit built alongside it may have to match that requirement, and sprinklers change the size of the service.

From measurements to the permit

Every reading goes on the plans: meter size, pressure, the route of the new line and the shutoff. San Marino's building department reads those notes alongside the full drawing set, where the setbacks and the gap between the two homes are also drawn. When sprinklers are part of the design, their layout may be reviewed as a separate submittal. We order the work so the water line is in and tested before the slab is poured, and the inspector sees the trench while it is open.

About our ADU Construction serviceEverything we build in San Marino

ADU Construction in San Marino: questions

Plan your project in San Marino

Tell us about the property and what you have in mind. We reply with a written next step.