Fire Rebuild & Reconstruction in Manhattan Beach

Manhattan Beach fire rebuild with structural connectors chosen for salt air: stainless steel or heavy galvanized straps, hold-downs and matching nails.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Every strap, hold-down and hanger in a Manhattan Beach rebuild ties the frame together against earthquake and wind, and salt air works on each one. We specify stainless steel connectors where they are exposed or close to the outer walls, and heavy galvanized coatings inside, with nails and screws of the same metal. Mixing metals speeds corrosion, so the schedule names both the connector and its fastener.

Choosing the coating

Standard connectors carry a thin zinc coat suited to dry interiors. Near salt air, or in contact with treated lumber, a much heavier galvanized coating or stainless steel lasts far longer. Stainless costs more and is kept for the most exposed spots: deck ledgers, posts, exterior beams and anything under a balcony. Hot-dip galvanized nails go with galvanized hardware, and stainless nails with stainless parts. The structural engineer confirms each substitution, since some connectors carry different load values in each finish.

Inspection and upkeep

City of Manhattan Beach building inspectors check the hardware at the frame inspection, reading the stamped part numbers against the structural sheets. Exposed connectors are best left visible or covered with removable trim, so they can be looked at later. Treated sill plates on the foundation get the same heavy coating on their anchor bolts and washers. If the parcel sits within the coastal zone, we confirm what that review covers early. Each connector grade is priced as its own line.

About our Fire Rebuild & Reconstruction serviceEverything we build in Manhattan Beach

Fire Rebuild & Reconstruction in Manhattan Beach: questions

Fire Rebuild & Reconstruction in other cities

More we build in Manhattan Beach

Plan your project in Manhattan Beach

Tell us about the property and what you have in mind. We reply with a written next step.