Fire Rebuild & Reconstruction in Encino

Encino fire rebuild that starts by testing the chimney and its footing left on the lot, before the scope, the engineering and LADBS review of the plans.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

The brick chimney left standing on a burned Encino lot is the first thing we put a hand and a meter on. It can look sound and still be cracked through the mortar, parted from its footing or pushed out of plumb by the heat. We check it before quoting, since keeping it or taking it down changes the foundation plan, the framing around the hearth and the budget.

Testing a chimney that survived

We sight the stack for lean with a level and a plumb line, rake the joints for loose mortar, and run a camera up the flue to look for a cracked liner. At the base, a small excavation shows whether the footing has cracked or settled. A masonry chimney built without steel reinforcement is treated by current seismic rules as a hazard, whatever its looks. A structural engineer reads our findings and states in a letter whether the stack can stay with bracing, needs rebuilding or should come down.

What the decision changes

Removing the stack frees the floor plan and lets a factory-built fireplace or a gas insert vent through a light framed chase. Keeping it means steel bracing tied into the new roof and floor framing, plus a liner sized for whatever burns in the firebox. Each path is priced on its own line. Plan check for Encino runs through LADBS, the City of Los Angeles building department, and the reviewer looks for the engineer's chimney detail on the structural sheets. If the stack goes, it comes down before new footings are dug.

About our Fire Rebuild & Reconstruction serviceEverything we build in Encino

Fire Rebuild & Reconstruction in Encino: questions

Fire Rebuild & Reconstruction in other cities

Plan your project in Encino

Tell us about the property and what you have in mind. We reply with a written next step.