Rebuilding in Los Angeles, Los Angeles County

Rebuilding after a fire in Los Angeles

Rebuilding a Los Angeles house lost to fire: lot assessment, a written scope, engineering, LADBS plan check and a staged build to the code in force now.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add what you are interested in, your first name and a phone number or an email.

Can the new house go back on the old footprint, and who has the final say? Put that to us before anything else, because the answer sets the shape of a Los Angeles rebuild. We begin at the cleared lot, find out what the fire left in the ground, and write a scope in the order the house will rise. Engineering, permits and construction then follow in stages you can track.

Who signs off on the plans

For a lot inside the City of Los Angeles, plan review and inspections run through LADBS, the city's building department. A rebuild is reviewed as new construction, so the drawings answer to the code that applies today, even where the lost house was approved under an older edition. We prepare the structural engineering and energy calculations with that review in mind, reply to plan check comments in writing, and keep every correction in a log you can read. Inspections then track the build: footings, framing, plumbing and electrical rough-in, insulation and the final visit. Each stage closes before the next opens.

A rebuild on a tight urban lot

Where neighboring houses stand close to the work, the site plan has to cover more than the new walls. We confirm property lines with a survey before forms go in, put up temporary fencing, and decide where lumber and concrete get set down so nothing leans on a neighbor's fence. If the old slab or footings have to come out, demolition is sequenced to keep dust contained. Jobs nearby in Glendale, Eagle Rock or South Pasadena follow the same written order, with a different permit counter reviewing the drawings.

Start your Los Angeles project with a lot visit

Send the address and where things stand. We reply with the next step.