Fire Rebuild & Reconstruction in Malibu

Malibu fire rebuild that keeps wind-driven rain out: sill pans, flashed openings and a drained wall behind the siding, then City of Malibu review.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Malibu is a coastal area, and any coastal lot can see rain driven sideways by wind, pushing water at every opening in the new walls. A rebuild starts from bare framing, so the water barrier can be built correctly from the sheathing out. We detail how each window, door and deck connection sheds water, then list those details in the scope before the siding is chosen.

Openings and the drained wall

Every window and door sits on a sloped sill pan that sends any leak back outside. Flashing tape laps shingle fashion over the weather barrier, so water always runs over a joint and never into one. Behind siding or stucco, a drainage gap lets moisture escape at the bottom through a screed or vent. Deck ledgers get metal flashing and spacers that keep wood off the wall. Salt in the air attacks ordinary steel, so flashings and fasteners are stainless or coated to last.

Roof water, embers and the city

Gutters with ember-resistant screens carry roof water to downspouts that discharge away from the foundation, and the drainage plan shows where it ends up. Parts of Malibu are on the fire hazard maps, so those gutters, the vents and the siding must also resist embers. The City of Malibu reviews the building plans, and the lot may fall within the coastal permit area, which we confirm early. Each waterproofing and fire detail is called out on the drawings for the inspector.

About our Fire Rebuild & Reconstruction serviceEverything we build in Malibu

Fire Rebuild & Reconstruction in Malibu: questions

Fire Rebuild & Reconstruction in other cities

Plan your project in Malibu

Tell us about the property and what you have in mind. We reply with a written next step.