Lakewood Structural Work, One Stage at a Time

Lakewood structural work after a fire, run in order: prop up, strip the char, let the engineer judge clean wood, then sister, replace, seal and inspect.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

In a Lakewood house where fire scorched the framing but left it standing, nothing is judged while the wood is still black. The order starts with temporary support under any member that looks weak, then charred surfaces are blasted clean so the engineer can see how much sound wood remains. Only after that review do sistering, replacement and sealing begin, followed by the inspection that comes before insulation.

Cleaning before judging

Char forms a layer that hides the wood beneath it. Soda or dry ice blasting takes that layer off without gouging good lumber, and it lifts soot from nail plates and straps so their condition shows too. Once the surfaces are clean, the engineer measures what is left of each stud, joist and rafter against its original size. Members that kept enough section stay. Those that lost too much are marked for sistering, where a new board is fastened alongside, or for full replacement.

Sealing, inspection and the price

After the structural repairs, the cleaned framing gets a sealer that locks in any smoke odor left in the wood. The permit comes from the building department that reviews Lakewood work, based on the engineer's repair plan. Its inspector then sees the sistered and new members, the nailing and the connectors before insulation or drywall goes up. Our quote follows the same stages, with blasting, structural repair and sealing priced as separate steps, and each step is finished before the next one starts.

About our Structural Work serviceEverything we build in Lakewood

Structural Work in Lakewood: questions

Structural Work in other cities

Plan your project in Lakewood

Tell us about the property and what you have in mind. We reply with a written next step.