New Construction in Redondo Beach, Starting With the Soil

New house construction in Redondo Beach that tests the soil for sulfates and chlorides before pricing the foundation, so the concrete mix and rebar cover fit.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

The first thing we probe on a cleared Redondo Beach lot is the soil chemistry. Ground near the ocean can carry chlorides and sulfates, and both shorten a foundation's life: sulfates break down the concrete paste, and chlorides rust the steel inside it. A soils engineer samples the ground and a lab runs the tests before we price the foundation. Those numbers decide the cement type, the strength of the mix and how deep the rebar is buried.

What the lab reports

Samples come from the depth where footings will sit. The lab reports sulfate content, chloride content, pH and resistivity, and the soils engineer assigns an exposure class from those readings. Low readings allow a standard mix. Higher ones call for sulfate-resistant cement, a lower water to cement ratio and a stronger concrete, with fly ash or slag where the engineer allows it. The structural engineer writes the exposure class on the foundation sheet, and the City of Redondo Beach reviewer checks that the specified mix matches it.

How it changes the build

A harsher exposure class adds cost in both the concrete and the steel. Rebar may need deeper cover, an epoxy coating or a corrosion inhibitor in the mix, and anchor bolts and hold-downs may move to hot dip galvanized or stainless. Where the soil is aggressive, a vapor retarder and a capillary break under the slab also slow moisture from carrying salts upward. The concrete supplier sends a batch ticket with each truck, and we keep those tickets with the inspection records for the house.

About our New Construction serviceEverything we build in Redondo Beach

New Construction in Redondo Beach: questions

Plan your project in Redondo Beach

Tell us about the property and what you have in mind. We reply with a written next step.