New Construction in Northridge With Fiber Cement Siding

New house construction in Northridge clad in fiber cement siding, picked to hold paint under hard inland sun and to stand up to dry wind without rot.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

For the walls of a new Northridge house, we specify fiber cement lap siding over a drained weather barrier. An inland lot takes hard sun and dry wind, and this board handles both. It does not rot, warp or feed insects, it holds paint far longer than wood under strong sun, and it is hard to ignite. Boards can arrive with the finish applied at the plant, which keeps field painting to touch-ups.

Hanging the boards

Each board is fastened into the studs at the spacing the manufacturer's installation guide sets, with corrosion-resistant nails driven snug to the face and never sunk below it. Butt joints land on a stud and get a strip of flashing behind them, so any water that slips past is turned outward onto the barrier. The bottom course stands clear of soil and paving, and the boards stop short of roof surfaces where a wall meets the roof, as the guide requires. Cuts are made outdoors with a saw that collects its dust, since the material releases silica when cut.

Living with a fiber cement wall

Upkeep is modest. The caulked joints at windows and trim get a look every so often, and boards primed on site need a fresh coat of paint at long intervals. Trim made from the same material keeps the whole skin moving together as it heats and cools. Dry wind can push grit and dust against a wall, and this surface shrugs it off without pitting. The exterior wall assembly is drawn on the plans LADBS reviews, and we photograph the barrier and every flashing before the boards cover them, so the hidden layers stay on record.

About our New Construction serviceEverything we build in Northridge

New Construction in Northridge: questions

Plan your project in Northridge

Tell us about the property and what you have in mind. We reply with a written next step.