New Construction on Your Inglewood Lot

New house construction in Inglewood with water handled at the slab: a gravel break, a vapor retarder, sloped soil and downspouts piped to an outlet.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Water control on a new Inglewood house begins under the slab. A layer of clean gravel breaks the path ground moisture would wick up, a heavy vapor retarder lies over it with taped seams, and the concrete goes on top. Around the outside, finished soil falls away from the walls and every downspout drains into a pipe. Those pieces work together, so floors stay flat and walls stay dry long after move-in.

Under and at the slab

The soils report tells us how thick the gravel layer must be and whether the vapor retarder needs a particular rating. Seams in the sheet are lapped and taped, and every pipe that rises through it is sealed with a boot. At the slab edge the sill plate sits on a gasket, and the bottom of the siding or plaster stops a short height above the soil. If the lot drains toward the house, an area drain or a shallow swale carries water around it. A moisture test on the cured slab confirms it is ready before wood or vinyl flooring goes down.

Roof water and the public street

Gutters and downspouts collect the roof and send it through solid pipe to an outlet the city accepts, such as a curb drain through the parkway or a dry well where the soil allows. A new house may also need to hold back some stormwater on the lot, depending on its size and the city's runoff rules. We show each pipe, its slope and its outlet on the drainage plan. Inglewood's building and engineering staff review that plan with the house, and the inspector checks the trench before it is closed.

About our New Construction serviceEverything we build in Inglewood

New Construction in Inglewood: questions

Plan your project in Inglewood

Tell us about the property and what you have in mind. We reply with a written next step.