ADU Construction in Ventura

Ventura ADUs whose roof water is caught in a rain barrel or tank: screened inlets, a first-flush diverter, a safe overflow path and City of Ventura review.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Rain falling on the roof of a Ventura backyard unit does not have to leave the lot right away. A downspout can feed a rain barrel or a larger tank beside the wall, where the water waits for the garden, and only the overflow moves on. On a coastal lot we pick tanks and fittings in plastic or aluminum, and the roof edge metal in aluminum too, because salt in the air eats at plain steel.

Sizing the tank and its overflow

A small roof sheds more water in a storm than one barrel can hold, so the overflow matters as much as the tank. An outlet near the top of the tank leads to a splash pad, a gravel strip or a buried pipe, aimed away from the unit's footings and the ground saved for the future house. Every opening is screened against mosquitoes, and a first-flush diverter sends the dirtiest water off the roof past the tank. A full tank is heavy, so it stands on a level, compacted base. Its water is used for irrigation only.

What the City of Ventura reviews

Ventura's own building staff check the ADU plans along with the drainage around the unit. A barrel filled by a downspout with no pump may need no plumbing permit of its own, while a larger tank with a pump, or one tied into irrigation lines, falls under the plumbing code's rainwater rules and is drawn on the plans. Either way, the overflow route appears on the site plan. A lot inside the state coastal zone may need a coastal approval before the building permit, so the parcel status is confirmed before design begins.

About our ADU Construction serviceEverything we build in Ventura

ADU Construction in Ventura: questions

Plan your project in Ventura

Tell us about the property and what you have in mind. We reply with a written next step.