La Habra Heights Structural Work for a Shower With No Curb

A curbless shower in a La Habra Heights house needs a lowered floor bay framed while the structure is open after a fire, so tile slopes and meets flush.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A shower with no curb lets a walker or a wheelchair roll straight in, and that floor has to drain and carry weight the same way every day. In a La Habra Heights house being reframed after a fire, the floor under that shower is lowered while the structure is open, so the tile can slope to the drain and still meet the bathroom floor flush at the entry.

Lowering the floor without weakening it

On a raised wood floor, cutting the tops of the joists to make room for a sloped mortar bed is off the table. The engineer redraws that bay: its joists are swapped for shallower, stronger members, set closer together where needed and hung lower on the framing beside them, so the floor drops and stays stiff. Blocking around the drain keeps the plumber from notching anything that carries load. On a slab, the concrete is cut out where the shower goes, the drain is set, and the recess is poured back at the lower level with steel doweled into the old slab.

Doorways and backing to match

A floor a chair can roll onto only helps if the doorway lets the chair through, so the bathroom opening is framed wider, with a header the engineer sizes for the new span. Solid backing goes into the walls around the shower and toilet before drywall, so grab bars have something to hold whenever they are mounted. A linear drain at the shower's edge or a center drain with the floor pitched from every side is chosen along with the framing, since each needs a different recess. Tile work starts only after the lowered bay and the drain pass inspection.

About our Structural Work serviceEverything we build in La Habra Heights

Structural Work in La Habra Heights: questions

Plan your project in La Habra Heights

Tell us about the property and what you have in mind. We reply with a written next step.