Fire Rebuild & Reconstruction in Stevenson Ranch

Stevenson Ranch fire rebuild planned for county building review and any fire department review, with ember details and the ground around the house drawn in.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

"Will the fire department look at our plans as well as the building office?" That comes up early on a cleared Stevenson Ranch lot, and on a parcel in a mapped hazard zone the answer can be yes. Los Angeles County building staff review the structure, and the county fire department may weigh in on access, water supply and the plan for vegetation around the house. We set both reviews into the scope.

Two reviews, one plan set

The building review covers footings, framing, energy and the exterior assembly, including vents, roofing, glazing and siding chosen to resist embers. A fire review, when it applies, looks at whether an engine can reach the house, where a hydrant stands, whether the water flow is adequate and how planting is kept back from the walls. A fuel modification plan may be requested. We gather those items early, so a fire comment does not hold up a building approval that is otherwise ready.

The ground right around the house

The strip of ground beside the walls matters on a mapped parcel as much as the walls themselves. We plan a band of gravel, pavers or concrete at the base of the house, with no wood mulch and no shrubs against the siding. Where a wood fence would meet the house, the last section is built in metal or masonry. Decks are framed and surfaced with materials rated for ignition resistance, and the space beneath them is kept clear or enclosed. These items are drawn on the site plan for the county to review.

About our Fire Rebuild & Reconstruction serviceEverything we build in Stevenson Ranch

Fire Rebuild & Reconstruction in Stevenson Ranch: questions

Fire Rebuild & Reconstruction in other cities

More we build in Stevenson Ranch

Plan your project in Stevenson Ranch

Tell us about the property and what you have in mind. We reply with a written next step.