Rebuilding in Porter Ranch, Los Angeles County

Rebuilding after a fire in Porter Ranch

Porter Ranch fire rebuild that starts at the water meter and the hydrant serving the street, since the sprinkler design for the new house depends on both.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add what you are interested in, your first name and a phone number or an email.

The water meter is what we look at first when we walk a cleared Porter Ranch lot. A new house in the City of Los Angeles gets fire sprinklers, and those can only be designed once the supply is known. We read the meter size, locate the hydrant that serves the street and note where the service line enters the property. Those readings go to the sprinkler designer before the floor plan is settled.

Sizing the supply for sprinklers

Residential sprinklers draw more water at once than any faucet or shower in the house. The designer works from a hydrant flow test, which the water provider can run or arrange, and compares the result with what the heads in the largest room will need. When the existing meter falls short, the plan calls for a bigger meter, a larger service line or both. That change belongs in the scope early, because the provider schedules its own work and sets its own charges. Upsizing late can mean trenching through a finished driveway.

Exterior rules on mapped ground

Some of Porter Ranch sits on mapped fire hazard zones. Where a lot is covered, ember resistance requirements can apply to the outside of the house. The roof needs a Class A assembly. Attic and underfloor vents use listed ember resistant designs. Eave overhangs are enclosed, siding is noncombustible or ignition resistant, and any deck attached to the walls is built from tested boards. LADBS reviews the sprinkler drawings along with these exterior details, and an inspector checks the work before walls are closed and again at the final visit.

Start your Porter Ranch project with a lot visit

Send the address and where things stand. We reply with the next step.