Structural Work in Culver City Where an Addition Meets the House

Where an older addition meets the house, Culver City structural repair ties footings, floors and roofs into one frame to an engineer's plan.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Where an earlier addition joins a Culver City house, the two frames may be held together by little more than siding nails. Opening that seam during fire repair can show two foundations side by side with nothing joining them, floor joists that stop short of each other, and roof framing lapped without straps. When the seam looks like that, the engineer details how the two parts become one structure, and the written scope grows to cover it.

Reading the seam between old and new

The joint often announces itself as a crack that runs along one line across the ceiling, the floor and the outside wall. We open it from inside and from underneath where the house allows. We look at whether the addition's footing reaches the same depth as the original, whether its floor framing hangs from a ledger or simply rests on the old sill, and whether the rafters of the two roofs are fastened to each other. After a fire, heat may have traveled along that gap, so we look for char deep inside the joint as well.

Tying the two parts together

The fix follows what the seam shows. Footings can be joined with steel dowels drilled in and set in epoxy, or an undersized footing can be deepened. Floor framing can gain a new ledger bolted to the original rim, with a hanger at each joist. Straps and blocking can join the two roofs so they move as one. These changes go to the City of Culver City as structural drawings, and the added cost gets a separate line in the written scope, showing what the seam added to the fire repair.

About our Structural Work serviceEverything we build in Culver City

Structural Work in Culver City: questions

Plan your project in Culver City

Tell us about the property and what you have in mind. We reply with a written next step.